Our Building

0

Posted by admin | Posted in Whatever things | Posted on 10-02-2009

Before I left for my study leave, construction of our office building was still on-going even though we were already occupying the building. I was quite dismayed when we first transferred to the new building because it looked so unfinished. Pipes running through the ceilings and walls were held in place by industrial clamps and were exposed for everyone to see. Even though the pipes were painted cream like the walls and ceilings, they were still visible, like exposed innards. I have been away for a month already and my officemate was telling me that the ceilings have been covered already, just like in our previous office. I hope that when I go back, the building’s facade will be much improved.

Write a comment